Snowline Gold Extends Strike Length by 550 M and Intersects 6.8 Grams per Tonne Gold Over 9.0 M at Its Jupiter Target, Einarson Project, Yukon

Summary
Major step-out at Jupiter extends known strike of orogenic gold system, with hole J-25-039 returning 5.5 m at 2.6 g/t Au...
Major step-out at Jupiter extends known strike of orogenic gold system, with hole J-25-039 returning 5.5 m at 2.6 g/t Au roughly 550 m north of previous drilling Continuity of mineralization highlighted by hole J-25-037, with 9.0 m at 6.82 g/t Auwithin a >500 m gap in previous drilling at Jupiter Drilling at the Valley gold deposit, Rogue Project, continues to expand known mineralization beyond the current Mineral Resource Estimate ("MRE") and Preliminary Economic Assessment ("PEA") mine plan1 VANCOVER, BC / ACCESS Newswire / September 24, 2025 / SNOWLINE GOLD CORP. (TSXV:SGD)(US OTCQB:SNWGF) (the "Company" or "Snowline") is pleased to announce additional drill results from ongoing exploration at its Rogue and Einarson projects in the eastern Yukon Territory.